--- title: "Loading places" slug: "tsmt-loading-place" updated: 2026-05-28T10:10:14Z published: 2026-05-28T10:10:14Z canonical: "docs.lobstersoftware.com/tsmt-loading-place" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.lobstersoftware.com/llms.txt > Use this file to discover all available pages before exploring further. # Loading places A loading place is assigned to a loading area. Loading places can be assigned via association criteria (see [Association criteria](/v1/docs/en/core-association-criteria)). ![images/download/attachments/58595416/19-04-_2018_09-46-34-version-1-modificationdate-1600671918294-api-v2.png](https://cdn.document360.io/4be90b94-ec83-41d8-963e-962df16110d4/Images/Documentation/19-04-_2018_09-46-34-version-1-modificationdate-1600671918294-api-v2.png) **(1)** **New**, **Delete**, **Cancel**, **Copy**, **Save**: Loading places can be saved copied and deleted in the data bank. **(2)** The data from a loading place can be entered here: The **Loading place name** and **Loading area** fields are obligatory. **(3)** List of the defined loading places. **(4) Loading place calculation:** Loading place calculations can be defined within a loading place. ![images/download/attachments/58595416/image2018-6-7_10_6_38-version-1-modificationdate-1600671917328-api-v2.png](https://cdn.document360.io/4be90b94-ec83-41d8-963e-962df16110d4/Images/Documentation/image2018-6-7_10_6_38-version-1-modificationdate-1600671917328-api-v2.png) **(1) Type of value** and **Calculation unit**: Indicates the value from the time slot booking entry that is used for the calculation. If possible, the unit should be included. **(2)** **Kind of goods**: This field indicates for which kind of goods the calculation is valid. **(3)** **Type of vehicle**: This field shows the type of vehicle for which the calculation is valid. **(4)** **Minutes per**: Indicates how many minutes are needed for loading and unloading the value entered in **Type of value**. **(5)** **Priority**: If several calculations were to apply, the calculation with the higher priority would be used. Should several calculation have the same priority, then the first found calculation would be used.